Featured
case study

Sector:
Transportation
Location:
United States
Washington Metropolitan Area Transit Authority
Results:
  • The variable speed, packaged pumping solution has reduced energy costs by over $8,500 per year
  • Choosing iFMS reduced installation time from days to hours and saved on labor costs
  • Using Design Envelope is saving close to 80% of energy usage compared to the old system
Caret RightDownload case study (PDF)

Energy audits

Energy Analysis

We thoroughly examine how and where energy is being used in your business and buildings and then tell you exactly where efficiencies and savings can be found.

Get started

resources & tools

More Tools

We have a suite of free online support materials and tools. Find the essentials to learn, apply, and maintain Armstrong equipment.

Get started

Contact Us

Contact us

We are happy to help. Discuss your project and product needs with us, check the status of your shipments, or let us save the day in an emergency.

Get in touch